
The opening of Gulf Shores’ massive pedestrian bridge over the Intracoastal Waterway is being pushed back from January to March so the city can complete two plazas at the base of the structure before allowing the public to use it.

The opening of Gulf Shores’ massive pedestrian bridge over the Intracoastal Waterway is being pushed back from January to March so the city can complete two plazas at the base of the structure before allowing the public to use it.